WC Stage 2.5 is well underway with the framing and waterproofing for the project set in place with the team at Midson Construction. This shot shows an example of using the existing constraints to your advantage, with the wide columns allowing for bench seating to be inset into the wall thickness below the windows. This area will be a great light filled seat, or nook for students to occupy in different ways throughout the day.